BestBank S.CETB · Mar 31, 2026 · Unit: Millions
Open blockersRefresh
OFFICIAL_EXPORT_BLOCKEDOfficial export is visibly blocked until approved rules, approved maps, non-virtual lineage, approved baseline, and validation pass.

GRC / Resilience

Incident register, KRIs, RCSA, action plans, and resilience evidence readiness.

Incident register
Data needed
Bank log required
KRIs
Thresholds needed
Configuration status
RCSA
Library needed
Control owners
BCP/resilience
Evidence needed
Owner action

GRC Register Readiness

Operational resilience surfaces are readiness views until source registers are loaded.

PanelStatusOwnerNext action
Incident registerData requirementsOperational RiskLoad incident log
KRIsEvidence neededRiskDefine thresholds
RCSAConfiguration statusControl OwnersLoad risk/control library
Issue/action planOwner evidence neededGRCAssign action owners
BCP/resilience panelEvidence neededOperationsAttach BCP evidence

Resilience Evidence

GRC data requirements are explicit before pilot configuration.

Data requirementsRegisters requiredIncident, KRI, RCSA, and BCP sources needed.
OwnerOperational RiskRisk and control owners must be assigned.
Next actionLoad source registersConnect GRC evidence during pilot.